Estimate cubic yards for a rectangular slab.

01 / INPUTS

Your numbers

02 / YOUR RESULT
1.358
Cubic yards including allowance

Default inputs are examples. Change them to match your situation.

How to use this calculator

Estimate cubic yards for a rectangular slab. Enter length (feet), width (feet), thickness (inches), extra material (%). The result updates when you change an input. To compare two sets of inputs, save scenario A, then enter the second set; the result panel shows the difference.

Formula and limits

Cubic yards = length(ft) × width(ft) × thickness(in) ÷ 12 ÷ 27, then multiplied by the allowance factor. Check dimensions and supplier requirements before ordering.

Worked example

The following example uses the calculator’s starting values. It is an illustration of the method, not a recommended target.

InputExample value
Length (feet)10
Width (feet)10
Thickness (inches)4
Extra material (%)10

Cubic yards including allowance: 1.358

Interpreting your result

Confirm actual dimensions, supplier specifications, and site conditions. Quantity estimates do not establish structural adequacy or compliance with building codes. Waste allowances are user assumptions.

Comparing alternatives

Save the first result as scenario A, then change one input. The comparison shows the numeric difference; it does not label either result as better. Choose inputs that describe realistic alternatives. Values shown on screen are rounded, so calculations from rounded intermediate results may differ slightly.

Implementation updated September 25, 2026 · How we check calculations